CASE STUDY

Chichester Solar Farm

The Chichester Solar Farm supports the power infrastructure for Fortescue Metals Group Christmas Creek and Cloudbreak mining operations, and the neighbouring Roy Hill mine. RE:GROUP was engaged to undertake the civil works for the new solar farm, working across multiple mine sites and adhering to each stakeholder’s individual protocols.

Clearing ~140 hectares
/  Construction of all roads and substation benches, across 3 mine sites
/  70,000 sqm of hardstand for the panel installation
/  Clearing and construction of access tracks
/  Clearing and construction of all transmission line pads
/  Load and haul of select materials from various borrow pits

RE:GROUP Wet and Dry Hire in The Pilbara Civil and mining contracting branding element

Location

Pilbara, WA

Client

Downer + FMG

Completion

Jun 2021